基于不同运行状态的风电机组齿轮箱故障率预测模型

陈庭记, 桂帆, 郭政, 唐自晶, 郑馨怡, 宋哲

太阳能学报 ›› 2023, Vol. 44 ›› Issue (4) : 45-51.

PDF(1795 KB)
欢迎访问《太阳能学报》官方网站,今天是
PDF(1795 KB)
太阳能学报 ›› 2023, Vol. 44 ›› Issue (4) : 45-51. DOI: 10.19912/j.0254-0096.tynxb.2021-1419

基于不同运行状态的风电机组齿轮箱故障率预测模型

  • 陈庭记1, 桂帆1, 郭政1, 唐自晶1, 郑馨怡1, 宋哲2
作者信息 +

FAULT RATE PREDICTION MODEL OF WIND TURBINES'GEARBOX UNDER DIFFERENT OPERATION STATUS

  • Chen Tingji1, Gui Fan1, Guo Zheng1, Tang Zijing1, Zheng Xinyi1, Song Zhe2
Author information +
文章历史 +

摘要

以往基于威布尔故障分布曲线对风电机组齿轮箱故障率的研究主要考虑时间因素,在此基础上,该文进一步考虑齿轮箱实际运行状态,结合威布尔故障分布模型中的浴盆曲线,构建同时考虑时间(t)和运行状态(s)的齿轮箱故障率模型,并计算其在4种不同运行状况(整体故障率升高、整体寿命缩短故障时间提前、故障期故障速率加快、故障期寿命缩短)的组合下模型的可靠性函数、故障累计分布函数、故障概率密度函数和特定时间下特定数量设备发生故障的概率。

Abstract

Previous research on the failure rate of wind power gearbox was based on the Weibull fault distribution curve mainly consider the time factor. This paper tries to considers the actual operational status of the gearbox into the reliability model, i.e. construct a gearbox failure rate model by considering operation time (t) and status (s) together, integrated with the bathtub curve of the Weibull distribution. The reliability function, failure cumulative distribution function, failure probability density function and failure probability of a specific number of equipment at a specific time of the model are calculated under the combination of four different operating status: increase of overall failure rate, shortening of overall life, advance of failure time, acceleration of failure rate in failure period and shortening of life in failure period. The results of this paper will provide a valuable tool for wind farm gearbox inventory management and maintenance cost planning.

关键词

风电机组 / 齿轮箱 / 状态监测 / 故障检测 / 计算模拟 / 运行状态

Key words

wind turbines / gear box / condition monitoring / fault detection / computer simulation / operation status

引用本文

导出引用
陈庭记, 桂帆, 郭政, 唐自晶, 郑馨怡, 宋哲. 基于不同运行状态的风电机组齿轮箱故障率预测模型[J]. 太阳能学报. 2023, 44(4): 45-51 https://doi.org/10.19912/j.0254-0096.tynxb.2021-1419
Chen Tingji, Gui Fan, Guo Zheng, Tang Zijing, Zheng Xinyi, Song Zhe. FAULT RATE PREDICTION MODEL OF WIND TURBINES'GEARBOX UNDER DIFFERENT OPERATION STATUS[J]. Acta Energiae Solaris Sinica. 2023, 44(4): 45-51 https://doi.org/10.19912/j.0254-0096.tynxb.2021-1419
中图分类号: TH132    TM315   

参考文献

[1] 苏健, 梁英波, 丁麟, 等. 碳中和目标下我国能源发展战略探讨[J]. 中国科学院院刊, 2021, 36(9): 1001-1009.
SU J, LIANG Y B, DING L, et al.Research on China's energy development strategy under carbon neutrality[J]. Bulletin of Chinese Academy of Sciences, 2021, 36(9): 1001-1009.
[2] 黄震, 谢晓敏. 碳中和愿景下的能源变革[J]. 中国科学院院刊, 2021, 36(9): 1010-1018.
HUANG Z, XIE X M.Energy revolution under vision of carbon neutrality[J]. Bulletin of Chinese Academy of Sciences, 2021, 36(9): 1010-1018.
[3] 刘长良, 王梓齐. 基于MSET和集成学习的风电机组齿轮箱故障预警[J]. 太阳能学报, 2020, 41(11): 228-233.
LIU C L, WANG Z Q.Fault early warning of wind turbine gearbox based on MSET and ensemble learning[J]. Acta energiae solaris sinica, 2020, 41(11): 228-233.
[4] CRABTREE C, FENG Y, TAVNER P.Detecting incipient wind turbine gearbox failure: a signal analysis method for on-line condition monitoring[C]//Proceedings of European Wind Energy Conference (EWEC 2010), Warsaw, Poland, 2010, 2023: 154156.
[5] SU C, HU Z Y.Reliability assessment for Chinese domestic wind turbines based on data mining techniques[J]. Wind energy, 2018, 21(3): 198-209.
[6] ALI J B, CHEBEL-MORELLO B, SAIDI L, et al. Accurate bearing remaining useful life prediction based on Weibull distribution and artificial neural network[J]. Mechanical systems and signal processing, 2015, 56-57: 150-172.
[7] 赵洪山, 鄢盛腾, 张小田. 风电机组确定性机会更换维修策略的研究[J]. 太阳能学报, 2014, 35(4): 568-575.
ZHAO H S, YAN S T, ZHANG X T.Deterministic opportunistic replacement maintenance strategy for wind turbine[J]. Acta energiae solaris sinica, 2014, 35(4): 568-575.
[8] 刘忠明, 段守敏, 王长路. 风力发电齿轮箱设计制造技术的发展与展望[J]. 机械传动, 2006, 30(6): 1-6, 31.
LIU Z M, DUAN S M, WANG C L.Development and prospect of design and manufacture technology of gearboxes for wind turbines[J]. Journal of mechanical transmission, 2006, 30(6): 1-6, 31.
[9] 李建华, 徐家生, 任丽娜. 可靠度约束下的不完全预防更换维修模型[J]. 太阳能学报, 2022, 43(4): 446-452.
LI J H, XU J S, REN L N.Imperfect preventive replacement and maintenance model under reliability constraints[J]. Acta energiae solaris sinica, 2022, 43(4): 446-452.
[10] 赵琴, 袁逸萍, 孙文磊, 等. 基于竞争失效的风电机组齿轮箱轴承剩余寿命分析[J]. 太阳能学报, 2021, 42(4): 438-444.
ZHAO Q, YUAN Y P, SUN W L, et al.Remaining useful life analysis of gearbox bearing of wind turbine based on competition failure[J]. Acta energiae solaris sinica, 2021, 42(4): 438-444.
[11] BLISCHKE W R, MURTHY D P.Reliability: modeling, prediction, and optimization[M]. John Wiley & Sons, 2011.
[12] CHARLES E E.可靠性与维修性工程概论[M]. 北京: 清华大学出版社, 2008.
CHARLES E E.Reliability and maintainability engineering[M]. Beijing: Tsinghua University Press, 2008.
[13] SPINATO F, TAVNER P J, VAN BUSSEL G J W, et al. Reliability of wind turbine subassemblies[J]. IET renewable power generation, 2009, 3(4): 387.
[14] TAVNER P J, XIANG J, SPINATO F.Reliability analysis for wind turbines[J]. Wind energy, 2007, 10(1): 1-18.
[15] BHARDWAJ U, TEIXEIRA A P, SOARES C G.Reliability prediction of an offshore wind turbine gearbox[J]. Renewable energy, 2019, 141: 693-706.

基金

国家自然科学基金(51577051; 71001050); 南京大学新时代文科卓越研究计划中长期研究专项

PDF(1795 KB)

Accesses

Citation

Detail

段落导航
相关文章

/