RAMPING ENERGY MARKET MECHANISM AND ITS BUSINESS MODEL OF VIRTUAL POWER PLANTS ORIENTED TO NEW POWER SYSTEM

Gao Hongchao, Wang Xuanyuan, Qiu Xiaoyan, Jin Tai, Xi Yanna

Acta Energiae Solaris Sinica ›› 2023, Vol. 44 ›› Issue (3) : 376-385.

PDF(1898 KB)
Welcome to visit Acta Energiae Solaris Sinica, Today is
PDF(1898 KB)
Acta Energiae Solaris Sinica ›› 2023, Vol. 44 ›› Issue (3) : 376-385. DOI: 10.19912/j.0254-0096.tynxb.2021-1284

RAMPING ENERGY MARKET MECHANISM AND ITS BUSINESS MODEL OF VIRTUAL POWER PLANTS ORIENTED TO NEW POWER SYSTEM

  • Gao Hongchao1, Wang Xuanyuan2, Qiu Xiaoyan1, Jin Tai3, Xi Yanna4
Author information +
History +

Abstract

Aiming at the problem of trading matching coordination caused by the volatility of renewable energy and the randomness of green energy users, a set of ramping energy market mechanism and its business model are proposed adapted to the participation of virtual power plants with aggregated flexible resources, in which the clean and flexible resources are allowed to be given priority to assist the safe and stable operation of power system. In the proposed mechanism, the ramping energy market is divided into two submarkets: conventional ramping units and third-party ramping units. In the latter, the virtual power plant operators are allowed to declare the quantity and price. Meanwhile, a priority clearing mechanism in accordance with the green energy consumption index and the response cost coefficient is proposed as well. The declared information is corrected according to the historical energy use of the virtual power plant’s proxy resources and the approval response cost, and the clearing sequence of the third-party market reflecting the green energy value and the resource response cost is obtained. Besides that, according to the proposed joint clearing mechanism of the traditional ramping units and the third-party market players, the clearing price of the traditional ramping energy market is transmitted to the third-party market as a price signal, and then clearing result is issued. By this, the competitive ecosystem for all of the ramping market units is constructed, thereby the better resources allocation is achieved. In addition, a variety of commercial operation models for virtual power plant oriented EVs to participate in the ramping energy market are designed, which improves the enthusiasm of demand-side resources. Finally, the given example verifies that the proposed mechanism reduces the system ancillary service cost, increases renewable energy consumption and achieves the green value certification, as well as meets the requirement of incentive compatibility, responds to fluctuation of renewable energy output and motivates the user’s willingness.

Key words

energy internet / renewable energy consumption / virtual power plant / ramping energy service / green energy

Cite this article

Download Citations
Gao Hongchao, Wang Xuanyuan, Qiu Xiaoyan, Jin Tai, Xi Yanna. RAMPING ENERGY MARKET MECHANISM AND ITS BUSINESS MODEL OF VIRTUAL POWER PLANTS ORIENTED TO NEW POWER SYSTEM[J]. Acta Energiae Solaris Sinica. 2023, 44(3): 376-385 https://doi.org/10.19912/j.0254-0096.tynxb.2021-1284

References

[1] 陈国平, 董昱, 梁志峰. 能源转型中的中国特色新能源高质量发展分析与思考[J]. 中国电机工程学报, 2020, 40(17): 5493-5506.
CHEN G P, DONG Y, LIANG Z F.Analysis and reflection on high-quality development of new energy with Chinese characteristics in energy transition[J]. Proceedings of the CSEE, 2020, 40(17): 5493-5506.
[2] 肖云鹏, 张兰, 张轩, 等. 包含独立储能的现货电能量与调频辅助服务市场出清协调机制[J]. 中国电机工程学报, 2020, 40(S1): 167-180.
XIAO Y P, ZHANG L, ZHANG X, et al.The coordinated market clearing mechanism for spot electric energy and regulating ancillary service incorporating independent energy storage resources[J]. Proceedings of the CSEE, 2020, 40(S1): 167-180.
[3] 杨梓俊, 荆江平, 邓星, 等. 虚拟电厂参与江苏电网辅助服务市场的探讨[J]. 电力需求侧管理, 2021, 23(4): 90-95.
YANG Z J, JING J P, DENG X, et al.Discussion on virtual power plant participating in ancillary service market of Jiangsu power grid[J]. Power demand side management, 2021, 23(4): 90-95.
[4] 段秦刚, 陈永椿, 王一, 等. 电力现货市场下激励型需求响应交易机制及出清模型[J]. 电力建设, 2021, 42(6): 145-156.
DUAN Q G, CHEN Y C, WANG Y, et al.Trading mechanism and clearing model of incentive demand response in electricity spot market[J]. Electric power construction, 2021, 42(6): 145-156.
[5] 王宣元, 王剑晓, 武昭原, 等. 基于随机鲁棒优化的虚拟电厂灵活调峰投标策略[J]. 可再生能源, 2020, 38(4): 539-544.
WANG X Y, WANG J X, WU Z Y, et al.Virtual power plant’s optimal bidding strategy for flexible ramping products based on a hybrid stochastic/robust optimization[J]. Renewable energy resources, 2020, 38(4): 539-544.
[6] 李嘉媚, 艾芊. 考虑调峰辅助服务的虚拟电厂运营模式[J]. 电力自动化设备, 2021, 41(6): 1-7.
LI J M, AI Q.Operation mode of virtual power plant considering peak regulation auxiliary service[J]. Electric power automation equipment, 2021, 41(6): 1-7.
[7] 薛晨, 任景, 马晓伟, 等. 面向高比例新能源消纳的西北调峰辅助服务市场机制及实践[J]. 中国电力, 2021, 54(11): 19-28.
XUE C, REN J, MA X W, et al.Mechanism of peak regulation auxiliary electricity market in the presence of high-penetration renewable energy and its practice in northwest China[J]. Electric power, 2021, 54(11): 19-28.
[8] 马喜平, 沈渭程, 杨臣, 等. 高比例新能源微电网参与电网调峰能力评估[J]. 电网与清洁能源, 2019, 35(8): 62-68.
MA X P, SHEN W C, YANG C, et al.Evaluation of high proportion new energy microgrids participating in peak shaving capacity of power grid[J]. Power system and clean energy, 2019, 35(8): 62-68.
[9] 赵晋泉, 杨余华, 孙中昊, 等. 考虑虚拟电厂参与的深度调峰市场机制与出清模型[J]. 全球能源互联网,2020, 3(5): 469-476.
ZHAO J Q,YANG Y H, SUN Z H, et al.Deep peak regulation market mechanism and clearing model considering participation of virtual power plants[J]. Journal of global energy interconnection, 2020, 3(5): 469-476.
[10] 李嘉媚, 艾芊, 殷爽睿. 虚拟电厂参与调峰调频服务的市场机制与国外经验借鉴[J]. 中国电机工程学报, 2022, 42(1): 37-56.
LI J M,AI Q, YIN S R.Market mechanism and foreign experience of virtual power plant participating in peak-regulation and frequency-regulation[J]. Proceedings of the CSEE, 2022, 42(1): 37-56.
[11] CHU Y, XIAO Q S, YANG L Q.Electric vehicle business model innovation study from the perspective of the energy internet[C]//2017 IEEE Conference on Energy Internet and Energy System Integration(EI2), Beijing, China, 2017: 1-6.
[12] 马英姿, 马兆兴. 基于博弈算法的电动汽车有序充电优化及效益分析[J]. 电力工程技术, 2021, 40(5): 10-16.
MA Y Z, MA Z X.Orderly charing optimization and benefit analysis of electric vehicles based on game algorithm[J]. Electric power engineering technology, 2021, 40(5): 10-16.
[13] 陈嘉敏, 徐永海, 张雪垠. 基于电动汽车V2G响应能力的储能容量配置方法[J]. 电力建设, 2019, 40(3): 34-41.
CHEN J M, XU Y H, ZHANG X Y.Energy storage sizing method considering V2G response capability[J]. Electric power construction, 2019, 40(3): 34-41.
[14] 张亚朋, 穆云飞, 贾宏杰, 等. 电动汽车虚拟电厂的多时间尺度响应能力评估模型[J]. 电力系统自动化, 2019, 43(12): 94-103.
ZHANG Y P, MU Y F, JIA H J, et al.Response capability evaluation model with multiple time scales for electric vehicle virtual power plant[J]. Automation of electric power systems, 2019, 43(12): 94-103.
[15] 陈张宇, 刘东, 刘浩文, 等. 基于精细化需求响应的虚拟电厂优化调度[J]. 电网技术, 2021, 45(7): 2542-2550.
CHEN Z Y, LIU D, LIU H W, et al.Optimal dispatching of virtual power plant based on refined demand response[J]. Power system technology, 2021, 45(7): 2542-2550.