OPTIMIZATION AND VERIFICATION OF WIND TURBINE SIMULATION MODEL BASED ON LOAD TEST

Wang Ruiliang, Sun Yong, Li Tao, Xu Yili, Fu Lingkun

Acta Energiae Solaris Sinica ›› 2023, Vol. 44 ›› Issue (4) : 92-98.

PDF(2662 KB)
Welcome to visit Acta Energiae Solaris Sinica, Today is
PDF(2662 KB)
Acta Energiae Solaris Sinica ›› 2023, Vol. 44 ›› Issue (4) : 92-98. DOI: 10.19912/j.0254-0096.tynxb.2021-1515

OPTIMIZATION AND VERIFICATION OF WIND TURBINE SIMULATION MODEL BASED ON LOAD TEST

  • Wang Ruiliang1,2, Sun Yong1,2, Li Tao1,2, Xu Yili1,2, Fu Lingkun1,2
Author information +
History +

Abstract

In this paper, a complete load test for a megawatt wind turbine is carried out, and a closed-loop design method containing simulation, load-test, model optimization and verification is proposed. Based on the test data, the frequency, damping, and pitch response of the wind turbine are identified to guide the optimization of simulation model. The verified results indicate that the trend of load results of optimized simulation model is same with that of measured data. The simulated frequency domain characteristics of the main components of the wind turbine are consistent well with those from measured data and meet the specification requirements. The proposed design method based on the load test can effectively improve the accuracy and reliability of the wind turbine simulation model.

Key words

wind turbines / simulation calculation / load testing / model optimization / parameter identification

Cite this article

Download Citations
Wang Ruiliang, Sun Yong, Li Tao, Xu Yili, Fu Lingkun. OPTIMIZATION AND VERIFICATION OF WIND TURBINE SIMULATION MODEL BASED ON LOAD TEST[J]. Acta Energiae Solaris Sinica. 2023, 44(4): 92-98 https://doi.org/10.19912/j.0254-0096.tynxb.2021-1515

References

[1] 可再生能源中长期发展规范[R].可再生能源中长期发展规范[R]. 国家发改委, 2022.
Specification for medium and long term development of renewable energy[R].Specification for medium and long term development of renewable energy[R]. National Development and Reform Commission, 2022.
[2] IEC 61400-1:2005, Wind turbines-Part 1: design requirements (third edition)[S].
[3] GB/Z 25458—2010, 风力发电机组合格认证规则及程序[S].
GB/Z 25458—2010, Rules and procedures for conformity testing and certification of wind turbine generator system[S].
[4] 文茂诗, 韩花丽. 风电机组实测载荷与Bladed仿真对比[J]. 风能, 2014(5): 96-100.
WEN M S, HAN H L.Comparison between measured load of wind turbine and bladed simulation[J]. Wind energy, 2014(5): 96-100.
[5] 林钧斌, 庄骏, 孙斌, 等. 风电机组机械载荷测试研究[J]. 机械制造, 2013, (7): 25-30.
LIN J B, ZHUANG J, SUN B, et al.Research on mechanical load test of wind turbine[J]. Machinery, 2013, (7): 25-30.
[6] 王树军, 马林静, 盛振国, 等. 风力发电机组设计评估中仿真载荷与测量值的比较[J]. 中国船检, 2013(12): 93-96.
WANG S J, MA L J, SHEN Z G, et al.Comparison between simulated load and measured value in wind turbine design evaluation[J]. China ship survey, 2013(12): 93-96.
[7] GB/T 37257—2018, 风力发电机组-机械载荷测量[S].
GB/T 37257—2018, Wind turbines-measurement of mechanical loads[S].
[8] 高俊云, 姜宏伟, 李超峰, 等. 风电机组塔筒载荷的测试与分析[J]. 机械设计, 2018, 35(11): 57-60.
GAO J Y, JIANG H W, LI C F, et al.Test and analysis of tower load for wind turbineon[J]. Journal of machine design, 2018, 35(11): 57-60.
[9] 付德义, 秦世耀, 薛扬, 等. 风力发电机组载荷测试叶根弯矩信号标定方法研究[J]. 可再生能源, 2013, 31(10): 62-64.
FU D Y, QIN S Y, XUE Y, et al.Research on calibration of blade root bending signal at wind turbine load measurement[J]. Renewable energy resources, 2013, 31(10): 62-64.
[10] BURTON T, SHARPE D, JENKINS N, et al.Wind energy handbook[M]. Chicherster: John Wiley & Sons, 2014.
[11] 李晖, 孙伟, 张永峰, 等. 悬臂薄板结构阻尼特性几种测试方法的比较[J]. 中国工程机械学报, 2013, 11(4): 347-353.
LI H, SUN W, ZHANG Y F, et al.Comparative study on testing methods for damping property of cantilever thin-plate structures[J]. Chinese journal of construction machinery, 2013, 11(4): 347-353.
PDF(2662 KB)

Accesses

Citation

Detail

Sections
Recommended

/