For planning the construction procedures, deploying vessels and equipment properly, to reduce cost and adapt to the requirements of offshore wind farm development in the coming era of flat rate, the algorithm based on mixed integer linear programming for construction weather window and efficiency is proposed. Utilizing the 1-hour hindcast wind and wave data with a time span of 25 years (1996-2020), the construction weather window and efficiency of the foundation construction and offshore wind turbine installation are evaluated both on spatial and temporal scope. With respects to the specific wind farms that will be constructed in the “14th Five-Year Plan”, the detailed analysis is performed. The results suggest that the efficiency of offshore foundation construction and wind turbine installation has significant spatial and temporal variation characteristics, and can be affected by the selected construction method. For specified offshore wind farm, the environment conditions, construction efficiency, vessels and equipment should be considered comprehensively to shorten the construction period and further reduce construction cost.
Key words
offshore wind farm /
weather window /
foundation construction /
wind turbine installation /
linear programming /
Guangdong sea area
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 时智勇, 王彩霞, 李琼慧. “十四五”中国海上风电发展关键问题[J]. 中国电力, 2020, 53(7): 8-17.
SHI Z Y, WANG C X, LI Q H.Key issues of China's offshore wind power development in the “14th Five-Year Plan”[J]. Electric power, 2020, 53(7): 8-17.
[2] 刘晋超. 海上风电施工窗口期对施工的重要性[J]. 南方能源建设, 2019, 6(2): 16-18.
LIU J C.Importance of window phase for offshore wind power construction[J]. Southern energy construction, 2019, 6(2): 16-18.
[3] 袁汝华, 黄海龙, 孙道青, 等. 海上风电风机基础结构形式及安装技术研究[J]. 能源与节能, 2018, (12): 59-61.
YUAN R H, HUANG H L, SUN D Q, et al.Research on basic structure and installation technology of offshore wind turbine[J]. Energy and energy conservation, 2018, (12): 59-61.
[4] WU X N, HU Y, LI Y, et al.Foundations of offshore wind turbines: a review[J]. Renewable and sustainable energy reviews, 2019, 104: 379-393.
[5] 田伟丽, 汪冬冬, 高健岳. 海上风电项目中导管架基础施工技术综述[J]. 中国港湾建设, 2020, 40(5): 20-24.
TIAN W L, WANG D D, GAO J Y.Summary of jacket foundation construction technology in offshore wind power project[J]. China harbour engineering, 2020, 40(5): 20-24.
[6] JIANG Z Y.Installation of offshore wind turbines: a technical review[J]. Renewable and sustainable energy reviews, 2021, 139: 110576.
[7] 王子俊. 某海上风电场施工总进度设计研究[J]. 水电与新能源, 2020, 34(6): 36-39.
WANG Z J.On the design of the general construction schedule of an offshore wind farm[J]. Hydropower and new energy, 2020, 34(6): 36-39.
[8] YOKOYAMA R, TAKEUCHI K, SHINANO Y, et al.Effect of model reduction by time aggregation in multiobjective optimal design of energy supply systems by a hierarchical MILP method[J]. Energy, 2021, 228: 120505.
[9] LI X M, HUANG B Q.A global sea state dataset from spaceborne synthetic aperture radar wave mode data[J]. Scientific data, 2020, 261(7): 1-25.