MIES TWO-LAYER OPTIMAL SCHEDULING CONSIDERING SOURCE-LOAD UNCERTAINTY

Ma Yun, Zhang Bo, Wu Xiaojie

Acta Energiae Solaris Sinica ›› 2026, Vol. 47 ›› Issue (12) : 233-242.

PDF(1721 KB)
Welcome to visit Acta Energiae Solaris Sinica, Today is
PDF(1721 KB)
Acta Energiae Solaris Sinica ›› 2026, Vol. 47 ›› Issue (12) : 233-242. DOI: 10.19912/j.0254-0096.tynxb.2025-1083

MIES TWO-LAYER OPTIMAL SCHEDULING CONSIDERING SOURCE-LOAD UNCERTAINTY

  • Ma Yun1,2, Zhang Bo2, Wu Xiaojie1
Author information +
History +

Abstract

In the context of high-proportion renewable energy integration and deepened energy coupling, to improve the energy utilization reliability and stability of the mine integrated energy system (MIES) and overcome the impact of wind-solar output and load prediction errors on the scheduling plan, a two-layer optimal scheduling scheme for MIES considering source-load uncertainty is proposed. Firstly, the energy supply structure and equipment models of MIES are established, covering electricity, heat, cold and other energy forms as well as mine-derived energy devices. Secondly, based on multi-scenario technology and fuzzy mathematics theory, the day-ahead and intra-day uncertainties of renewable energy output and load demand are modeled. Latin hypercube sampling is used to generate wind-solar-load scenarios, and clustering reduction is applied to obtain typical scenarios. Fuzzy chance-constrained programming is utilized to relax the power balance constraints of intra-day scheduling into the constraints under a certain confidence level. Finally, in the uncertain environment, day-ahead scheduling is conducted aiming to minimize the mine operation cost and carbon emission cost, and intra-day flexible adjustments are made based on the day-ahead plan. Taking a coal mine in Hulunbuir, Inner Mongolia as a case study, the results show that the proposed method can balance the risk and return of day-ahead and intra-day scheduling plans, reduce operation and carbon emission costs, and ensure the safety and reliability of energy supply. This method is of great significance for promoting the optimal operation and sustainable development of MIES.

Key words

clean energy / uncertainty analysis / optimization / mine integrated energy system / multi-scenario technology / fuzzy constraint

Cite this article

Download Citations
Ma Yun, Zhang Bo, Wu Xiaojie. MIES TWO-LAYER OPTIMAL SCHEDULING CONSIDERING SOURCE-LOAD UNCERTAINTY[J]. Acta Energiae Solaris Sinica. 2026, 47(12): 233-242 https://doi.org/10.19912/j.0254-0096.tynxb.2025-1083

References

[1] Wang Y L, Wang Y D, Huang Y J, et al.Planning and operation method of the regional integrated energy system considering economy and environment[J]. Energy, 2019, 171: 731-750.
[2] 鞠建华, 韩见, 冯聪. 我国矿产资源综合利用现状评估与发展路径[J]. 中国矿业, 2024, 33(6): 14-25.
Ju J H, Han J, Feng C.Evaluation and development path of comprehensive utilization of mineral resources in China[J]. China Mining Magazine, 2024, 33(6): 14-25.
[3] 李江成, 李嘉翔, 任浩栋. 考虑伴生能源的煤矿综合能源系统两阶段运行优化[J]. 电力大数据, 2022, 25(2): 27-36.
Li J C, Li J X, Ren H D.Two-stage operation optimization of coal mining integrated energy system considering associated energy[J]. Power Systems and Big Data, 2022, 25(2): 27-36.
[4] 穆云飞, 吴志军, 郭浩辰, 等. 煤矿区综合能源微网架构及低碳运行优化研究[J]. 中国工程科学, 2023, 25(5): 111-121.
Mu Y F, Wu Z J, Guo H C, et al.Integrated energy microgrids and low-carbon operation optimization of coal mining areas[J]. Strategic Study of CAE, 2023, 25(5): 111-121.
[5] 费孝天, 张勇, 胡荷娟, 等. 计及P2G的矿山综合能源系统两阶段分布式鲁棒优化调度方法[J]. 太阳能学报, 2025, 46(5): 149-157.
Fei X T, Zhang Y, Hu H J, et al.Two-stage distributed robust optimal scheduling method for coal mine integrated energy system considering P2G[J]. Acta Energiae Solaris Sinica, 2025, 46(5): 149-157.
[6] 吕超贤, 罗刚, 孙文, 等. 产-需全链条耦合的矿山综合能源电-热-煤协同低碳调度[J]. 电力自动化设备, 2025, 45(2): 61-68.
Lü C X, Luo G, Sun W, et al.Electricity-heat-coal collaborative low-carbon scheduling of coal mine integrated energy system considering full chain coupling of production and demand[J]. Electric Power Automation Equipment, 2025, 45(2): 61-68.
[7] 王龙飞, 王帅, 李庆, 等. 西部地区矿井多能互补热电协同供能系统配置优化[J]. 煤炭学报, 2025, 50(5): 2739-2751.
Wang L F, Wang S, Li Q, et al.Optimization configuration of coal mine multi-energy complementary heat and power coordinated supply system in western China[J]. Journal of China Coal Society, 2025, 50(5): 2739-2751.
[8] 曾博, 胡品端, 王涵, 等. 基于NSBM-DEA的矿山综合能源系统能效评估方法[J]. 太阳能学报, 2025, 46(3): 177-188.
Zeng B, Hu P D, Wang H, et al.Energy efficiency evaluation method of mine integrated energy system based on NSBM-DEA[J]. Acta Energiae Solaris Sinica, 2025, 46(3): 177-188.
[9] 梁喆, 李梅, 周孟然. 含P2G和混合电储能的矿山综合能源系统多目标优化调度[J]. 电力自动化设备, 2021, 41(10): 122-129.
Liang Z, Li M, Zhou M R.Multi-objective optimal dispatch of mining area integrated energy system with P2G and hybrid electric energy storage[J]. Electric Power Automation Equipment, 2021, 41(10): 122-129.
[10] 黄宏旭, 梁睿, 张小彤, 等. 计及碳约束下的煤矿综合能源系统多目标配置双层优化[J]. 电网技术, 2022, 46(5): 1731-1741.
Huang H X, Liang R, Zhang X T, et al.Two-stage multi-objective deployment optimization of coal mine integrated energy system considering carbon emission constraints[J]. Power System Technology, 2022, 46(5): 1731-1741.
[11] Lyu G Y, Cao B, Jia D X, et al.Optimal scheduling of regional integrated energy systems considering hybrid demand response[J]. CSEE Journal of Power and Energy Systems, 2024, 10(3): 1208-1219.
[12] 郭斯琦, 楼劲, 郑凌蔚. 考虑热网特性的综合能源系统混合时间尺度调度方法[J]. 电力建设, 2024, 45(12): 16-26.
Guo S Q, Lou J, Zheng L W.Hybrid time scale scheduling method for integrated energy systems considering the characteristics of heating networks[J]. Electric Power Construction, 2024, 45(12): 16-26.
[13] Wu H B, Liu Z, He Y, et al.Two-layer optimal scheduling method for regional integrated energy system considering flexibility characteristics of CHP system[J]. Energy, 2024, 308: 132970.
[14] Carmona R, Yang X S.Joint granular model for load, solar and wind power scenario generation[J]. IEEE Transactions on Sustainable Energy, 2024, 15(1): 674-686.
[15] 苏子越, 柴琳, 谢亮, 等. 基于变分模态分解的综合能源系统短期电负荷预测[J]. 热力发电, 2024, 53(12): 21-28.
Su Z Y, Chai L, Xie L, et al.Short-term electrical load forecasting for integrated energy system based on variational mode decomposition[J]. Thermal Power Generation, 2024, 53(12): 21-28.
[16] 赵曰浩, 鞠平. 考虑供气约束与净负荷预测误差的电-气综合能源系统调度策略[J]. 电力自动化设备, 2022, 42(7): 221-228.
Zhao Y H, Ju P.Scheduling strategy of integrated electricity and gas system considering constraint of gas supplying and prediction error of net power load[J]. Electric Power Automation Equipment, 2022, 42(7): 221-228.
[17] 孙亚南, 黄越辉, 孙谊媊, 等. 基于运行数据的短期风电功率预测误差互补特性探析[J]. 电力系统自动化, 2021, 45(21): 215-223.
Sun Y N, Huang Y H, Sun Y Q, et al.Operation data based analysis on complementary characteristics of short-term power prediction error for wind power[J]. Automation of Electric Power Systems, 2021, 45(21): 215-223.
[18] 甘艳, 黄菁雯, 吴军, 等. 含风电光伏电力系统概率潮流计算改进方法研究[J]. 电力科学与技术学报, 2023, 38(5): 34-43.
Gan Y, Huang J W, Wu J, et al.Research on probabilistic power flow calculation improvement method of power system including wind and photovoltaic power generation[J]. Journal of Electric Power Science and Technology, 2023, 38(5): 34-43.
[19] 杨世明, 李睿, 赵昕, 等. 计及多重不确定性的IES两阶段多目标协同规划方法[J]. 太阳能学报, 2025, 46(4): 220-231.
Yang S M, Li R, Zhao X, et al.Two-stage multi-objective collaborative programming method for IES considering multiple uncertainties[J]. Acta Energiae Solaris Sinica, 2025, 46(4): 220-231.
[20] 魏建东, 陆建峰, 彭甫镕. 一种层次初始的聚类个数自适应的聚类方法研究[J]. 电子设计工程, 2015, 23(6): 5-8.
Wei J D, Lu J F, Peng F R.Research on a method of self-adaptation of the number of clusters for hierarchical initialization clustering[J]. Electronic Design Engineering, 2015, 23(6): 5-8.
[21] 梁天成, 李凌. 计及碳交易与需求响应的多典型日综合能源系统优化模型[J]. 热能动力工程, 2024, 39(10): 113-123.
Liang T C, Li L.Multi-typical day integrated energy system optimization model considering carbon trading and demand response[J]. Journal of Engineering for Thermal Energy and Power, 2024, 39(10): 113-123.
[22] 南斌, 姜春娣, 董树锋, 等. 计及源荷不确定性的综合能源系统日前-日内协调优化调度[J]. 电网技术, 2023, 47(9): 3669-3680.
Nan B, Jiang C D, Dong S F, et al.Day-ahead and intra-day coordinated optimal scheduling of integrated energy system considering uncertainties in source and load[J]. Power System Technology, 2023, 47(9): 3669-3680.
[23] 骆晨, 蔡梦怡, 王书宏, 等. 计及模糊机会约束的含高比例光伏配电网检修重构协同优化方法[J]. 智慧电力, 2025, 53(2): 111-118.
Luo C, Cai M Y, Wang S H, et al.A collaborative optimization method for distribution network maintenance and reconstruction with high penetration of photovoltaic generation considering fuzzy chance constraints[J]. Smart Power, 2025, 53(2): 111-118.
PDF(1721 KB)

Accesses

Citation

Detail

Sections
Recommended

/

〈 〉